F S Group is the Architect of Record for the largest Progressive Design-Build project currently under construction in the United States

HOUSTON, July 21, 2023 — (PRNewswire) —

The City of Houston Northeast Water Purification Plant and Campus (NEWPP) is being performed by the Houston Waterworks Team (HWT). HWT is a Joint Venture between CDM Smith and Jacobs with F S Group Architects as the Architect of Record and Isani as Civil Engineers.

HOUSTON, July 21, 2023 /PRNewswire-PRWeb/ -- F S Group is the Architect of Record for the largest Progressive Design-Build project currently under construction in the United States.

  • The City of Houston Northeast Water Purification Plant and Campus (NEWPP) is a $1.8B Progressive Design-Build project which will expand the existing Northeast Water Purification Plant's capacity from 80Mgpd to 400Mgpd.
  • The NEWPP Project is being performed by the Houston Waterworks Team (HWT). HWT is a Joint Venture between CDM Smith and Jacobs with F S Group Architects as the Architect of Record and Isani as Civil Engineers.
  • The NEWPP Campus has more than 50 Buildings including a 3-story Administration and Maintenance Building, 3-Story Dewatering Building, 2-Story High Service Pump Station, as well as a Large Intake Pump Station Building at the shore of Lake Houston.

The Northeast Water Purification Plant expansion is a pivotal part of the Houston region's conversion from groundwater to surface water. The NEWPP treats Lake Houston water and turns it into drinking water for segments of Harris and Fort Bend counties and surrounding areas. The additional demand for surface water will be offset by the Luce Bayou Interbasin Transfer Project drawing water from the Trinity River and transferring it into Lake Houston. This network of surface water transfers allows the additional demands for water to be met without the use of groundwater.

Construction began in 2018 using a progressive design-build approach and will be completely online in 2025. The first phase increased the capacity of the NEWPP from the 80 mgd to 160 mgd in 2021. The second phase will increase the overall facility production capacity to 400 mgd by 2024. The entire upgrade once complete will have increased the plant's output of freshwater by 320 million gallons per day.

Five water providers – the North Harris County Regional Water Authority (NHCRWA), the West Harris County Regional Water Authority (WHCRWA), the Central Harris County Regional Water Authority (CHCRWA), the North Fort Bend Water Authority (NFBWA), and the City of Houston – joined together to share the cost of this expansion project.

The Northeast Water Purification Plant expansion includes conventional treatment processes like the existing plant that help coagulate, settle, filter, and then disinfect the water to a quality that exceeds requirements set forth by the Texas Commission on Environmental Quality (TCEQ). Additionally, an advanced oxidation process called ozonation is being constructed. Ozonation is a very powerful process for disinfecting water to help ensure that harmful organisms are eliminated. Ozonation also helps eliminate taste and odor-causing compounds, improving the aesthetic quality of the water supplied by the plant.

MORE INFORMATION ABOUT THE PROGRESSIVE DESIGN-BUILD TEAM

Houston Waterworks Team:

CDM Smith:  www.cdmsmith.com

Jacobs:  www.jacobs.com

F S Group Architects:  www.fsdesignbuild.com

Isani:  www.isaniconsultants.com

ABOUT F S GROUP ARCHITECTS

F S Group Architects is a boutique design firm led by Sabir, AIA, LEED AP who worked as a designer for SOM and Gensler on award-winning projects before creating his own Design Studio in 1998. Over the past 25 years, Sabir's team has grown to include very talented and experienced Licensed Architects, Interior Designers, and Project Managers to comprise a well-balanced team of 20 staff members capable of designing and delivering complete construction documents for large, master-planned, multi-building complexes as well as single-tenant buildings and corporate interiors.

F S Group Architects is celebrating our 25th anniversary this year! Founded in 1998, Sabir, AIA began his firm to deliver full-service programming, interiors, and architectural design to clients with demanding and complex projects, like aviation, emergency operations, space/science, and design-build. Where state-of-the-art meets details, dedication, and delivery, you will find F S Group Architects. Your first choice for partnering.

Media Contact

Sarah Ali, F S Group Architects, 1 (713) 344-1752 , Email Contact, https://www.fsdesignbuild.com/

 

SOURCE F S Group Architects

Contact:
Company Name: F S Group Architects

Featured Video
Jobs
CAD Engineer for Nvidia at Santa Clara, California
GPU Design Verification Engineer for AMD at Santa Clara, California
Design Verification Engineer for Blockwork IT at Milpitas, California
Senior Firmware Architect - Server Manageability for Nvidia at Santa Clara, California
Senior Platform Software Engineer, AI Server - GPU for Nvidia at Santa Clara, California
Upcoming Events
Phil Kaufman Award Ceremony and Banquet to be held November 6 at Hayes Mansion at Hayes Mansion 200 Edenvale Ave San Jose CA - Nov 6, 2024
SEMICON Europa 2024 at Messe München München Germany - Nov 12 - 15, 2024
DVCon Europe 2023 at Holiday Inn Munich – City Centre Munich Germany - Nov 14 - 15, 2024
SEMI MEMS & Imaging Sensors Summit, at International Conference Center Munich Germany - Nov 14, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise