Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost and Safety

Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost, and Safety

Bentley Systems announces the early access of Bentley’s Design Insights cloud service, a new extension of Bentley’s Scenario Services. Design Insights brings instant insight to the impact of design changes on the performance measures of organizations including project schedule, cost, and safety compliance.

Designers and engineers make hundreds of decisions in relative isolation, without fully understanding the impact of these decisions on other disciplines or downstream activities that influence project performance. Bentley’s Design Insights helps project teams make better-informed and more timely decisions that reduce cost overruns and unexpected project delays as insights into the project are gained much earlier.

Understand at a glance the ramification of change decisions on organizational and project performance metrics.

Design Insights utilizes the common digital engineering iModel created by users of Bentley’s AECOsim Building Designer, OpenPlant Modeler, RAM, STAAD, or Autodesk’s Revit™ to extract insights on key performance metrics for designers, owners, and project managers.

Bentley’s Design Insights enables:

  • Relative estimation of structural safety, cost, and schedule changes between design iterations
  • Heatmaps to identify areas of change between design iterations
  • Practical consideration of multiple design alternatives in parallel

Raoul Karp, Bentley’s VP of product development, analytical modeling, said, “Too often in today’s design world the true impact of important design decisions is not fully understood until construction is well underway. By providing designers, engineers, architects, and owners immediate insight into the downstream ramifications of decisions and tradeoffs to be made during design, team members can make better holistic decisions with the critical information at their fingertips.”

Featured Video
Latest Blog Posts
Sanjay GangalEDACafe Editorial
by Sanjay Gangal
Industry Predictions for 2025 – Cofactr
Sanjay GangalEDACafe Editorial
by Sanjay Gangal
EDACafe Industry Predictions for 2025 – Everspin
Jobs
Senior Platform Software Engineer, AI Server - GPU for Nvidia at Santa Clara, California
GPU Design Verification Engineer for AMD at Santa Clara, California
Senior Firmware Architect - Server Manageability for Nvidia at Santa Clara, California
CAD Engineer for Nvidia at Santa Clara, California
Sr. Silicon Design Engineer for AMD at Santa Clara, California
Upcoming Events
CHIPLET SUMMIT 2025 at Santa Clara Convention Center Santa Clara CA - Jan 21 - 23, 2025
ESD Alliance "Savage on Security” Webinar at United States - Jan 23, 2025
SEMICON Korea 2025 at Hall A, B, C, D, E, GrandBallroom, PLATZ, COEX, Seoul Korea (South) - Feb 19 - 21, 2025
DVCon U.S. 2025 at United States - Feb 24 - 27, 2025



© 2025 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise