Anhui Transport Consulting and Design Institute Co. Ltd Improves Design Efficiency and Quality on the Second Wuhu Yangtze River Highway Bridge (Bentley)

The Second Wuhu Yangtze River Highway Bridge spans the Yangtze River between Shijian in Wuwei County and Eshan Mountain in Fanchang. Currently under construction, it is the world's longest cable-stayed bridge and the largest assembled using whole external pre-stressed steel beam sections. When connected with the completed Wuhu-Tongling Freeway, the bridge will measure approximately 57 kilometers long and play a vital role in improving the regional highway network, pushing forward Wan-Jiang urban belt construction for industry transfer and promoting regional economic and social development.

Xi Jin, president of Engineering Technology Research Instituteat Anhui Transport Consulting & Design Institute, said,“Bentley’s bridge solution has enhanced design efficiency and quality, and with the ability to pass the 3D information model into operations, it can help deliver a reduction in lifecycle cost plus effective management of risk on projects.”

The project team generated what it calls a virtual engineering environment by overlaying Digital Elevation Models on satellite imagery, enabling it to select the optimal location to minimize construction risk and environmental conflicts. Bentley’s bridge solution, which includes MicroStation and ProjectWise plus design and structural analysis applications, is then used to create a 3D model that can be used for virtual construction, avoiding the risks and difficulties of complex project construction.

 

 

 

Featured Video
Editorial
More Editorial  
Jobs
Senior Platform Software Engineer, AI Server - GPU for Nvidia at Santa Clara, California
Sr. Silicon Design Engineer for AMD at Santa Clara, California
Design Verification Engineer for Blockwork IT at Milpitas, California
GPU Design Verification Engineer for AMD at Santa Clara, California
Senior Firmware Architect - Server Manageability for Nvidia at Santa Clara, California
CAD Engineer for Nvidia at Santa Clara, California
Upcoming Events
MEMS & Sensors Executive Congress (MSEC 2024) at Château-Bromont Hotel in Bromont Quebec Canada - Oct 7 - 9, 2024
PCB West 2024 at Santa Clara Convention Center Santa Clara CA - Oct 8 - 11, 2024
DVcon Europe 2024 at Holiday Inn Munich City Center, Munich Germany - Oct 15 - 16, 2024
International Test Conference (ITC) at United States - Nov 3 - 8, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise