Awards for three stadiums by gmp: Two gold and one bronze at the IOC/IAKS Awards

October 24, 2013 -- Three stadiums by architects von Gerkan, Marg and Partners (gmp) received the most important international architectural awards for sports and leisure buildings. At this year’s IOC/IAKS Awards, the Bao’An Stadium in Shenzhen, China, received a gold medal in the “Major outdoor stadiums” category. The Shanghai Oriental Sports Center in China won another gold in the “Pools and wellness facilities” category. And the Warsaw National Stadium in Poland received the bronze medal in the “Major outdoor stadiums” category. The awards by the International Association for Sports and Leisure Facilities (IAKS) and the Olympic Committee (IOC) have been made every two years since 1987. This year, 97 projects from 30 countries were submitted.


Shanghai Oriental Sports Center: Gold in the “Pools and wellness facilities” category

For the competitions of the 14th FINA World Aquatics Championships in 2011, a new sports centre was created in Shanghai covering an area of over 347,000 square metres and comprising a sports stadium, a pool stadium, an outdoor pool for diving competitions and a media center. The link element between the different venues is an artificial lake. The buildings are supported on platforms that project into the lake. Towards the north, this results in a softly curving bank around the circular stadiums and, to the south, in a straight edge at the outdoor pool.
               

  • Competition: 2008 – 1. prize
  • Design: Meinhard von Gerkan and Nikolaus Goetze with Magdalene Weiss
  • Project management: Chen Ying
  • Team: Jan Blasko, Lü Cha, Lü Miao, Jörn Ortmann, Sun Gaoyang, Yan Lüji, Jin Zhan, Fang Hua, Martin Friedrich, Fu Chen, Ilse Gull, Kong Rui, Lin Yi, Katrin Löser, Ren Yunping, Alexander Scho­ber, Nina Svensson, Tian Jinghai, Zhang Yan, Zhou Yunkai, Zhu Honghao
  • Structural engineering: schlaich bergermann und partner, Sven Plieninger
  • Technical equipment: ARUP
  • Landscape design: WES & Partner
  • Chinese partner practice: SIADR, Tongji Design Institute
  • Client: Shanghai Administration of Sports
  • Construction period: 2009–2011

Bao’An Stadium, Shenzhen: Gold in the “Major outdoor stadiums” category

This stadium for 40,000 spectators was built on the occasion of the 2011 Universiade. The design was inspired by the bamboo forests of southern China. The image of the bamboo forest is created by a double ring of green steel posts whereby every other post of the inner ring combines with the concrete structure of the undulating upper rank, supporting the vertical loads from the spectator stands. The roof of the spectator stands consists of a tensile membrane structure with an inner ring and radial spokes. In detail, the roof is formed of 36 radial cable pairs which are tied together above the playing field via a double circular tensile ring consisting of cable bundles.
               

  • Competition: 2007 – 1. prize
  • Design: Meinhard von Gerkan and Stephan Schütz with David Schenke
  • Project management: David Schenke, Li Ran
  • Team, design phase: Jennifer Heckenlaible, Daniela Franz, Zhang Xi, Yin Chao Jie, Zhou Bin, Anna Bulanda-Jansen, Cai Qing, Xu Ji
  • Team, execution phase: Matthias Grünewald, Cai Yu, Wang Le, Wang Li, Zhang Xi, Lucas Gallardo, Zhang Xiao Guang, Sebastian Linack, Li Zheng, Pan Xin, Martin Schulte-Frohlinde
  • Chinese partner practice: SCUT South China University of Technology
  • Structural engineering: schlaich bergermann und partner, Sven Plieninger mit Wei Chen
  • Lighting Design: Schlotfeld Licht, Berlin
  • Client: The Sports Bureau of Bao’an District
  • Construction: period 2009–2011

Warsaw National Stadium: Bronze in the “Major outdoor stadiums” category

This stadium for 55,000 spectators was completed on the occasion of the 2012 UEFA European Championship. Its unmistakable visual impact results from the expanded metal panels in the facade in the striking Polish national colours, red and white. This translucent layer combines the different areas of the stadium into one large unit. Even when daylight strength is moderate, the interwoven facade elements create a rich interplay of light and shade. At night, the colour and striking contours of this facade are emphasised even more by its integrated lighting.
                

  • Competition: 2007 – 1. prize
  • Design gmp: Volkwin Marg and Hubert Nienhoff with Markus Pfisterer; J.S.K. Architekci Sp. z o.o.; schlaich bergermann und partner
  • Project management: Markus Pfisterer, Martin Hakiel
  • Project management, roof: Martin Glass
  • Team, design phase: Stephanie Eichelmann, Silke Flassnöcker, Lars Laubenthal, Fariborz Rahimi-Nedjat
  • Team, execution phase, gmp: Carsten Borucki, Lena Brögger, Katarzyna Ciruk, Stefanie Eichelmann, Silke Flassnöcker, Alberto Franco Flores, Ruthie Gould, Patrick Klügel, Monika Kwiatkowski, Lars Laubenthal, Ausias José Lobatón Ortega, Fariborz Rahimi-Nedjat, Nikolai Reich, Stefan Saß, Florian Schwarthoff, Sonia Taborda, Semra Ugur
  • Structural engineering roof and facade: schlaich bergermann und partner, Knut Göppert mit Knut Stockhusen und Lorenz Haspel
  • Technical equipment: HTW, Hetzel, Tor-Westen + Partner
  • Landscape design: RAK, Architectura Krajobrazu, Warschau
  • General contractor: Konsorcjum ALPINE BAU DEUTSCHLAND AG, ALPINE BAU GmbH, ALPINE Construction Polska Sp. z o.o., HYDROBUDOWA POLSKA S.A. i PBG S.A.
  • Client: Narodowe Centrum Sportu Sp. z o.o.
  • Construction period: 2008–2011

gmp: Worldwide stadium builders

For several years, the architects von Gerkan, Marg and Partners have been making a name for themselves in stadium design. Their projects include the Berlin Olympic Stadium, which was renovated and refurbished for the FIFA World Cup in 2006; the stadiums in Cape Town, Port Elizabeth and Durban, completed for the 2010 World Cup in South Africa and the stadiums in Warsaw and Kiev completed for the 2012 UEFA European Championship in Poland and Ukraine. Currently, gmp Architects are involved with the design for the National Stadium in Brasília and the Arena da Amazônia in Manaus for the 2014 FIFA World Cup in Brazil. In addition, they are responsible for the design of the modernisation of a third World Cup stadium – the Mineirão Stadium in Belo Horizonte.



Contact: 

Claudia Tiesler,
Public Relations and Communication
gmp · von Gerkan, Marg and Partners · Architects
T: +49.40.88 151 123
F: +49.40.88 151 184
Email Contact
www.gmp-architekten.de

Featured Video
Jobs
Senior Platform Software Engineer, AI Server - GPU for Nvidia at Santa Clara, California
Sr. Silicon Design Engineer for AMD at Santa Clara, California
Design Verification Engineer for Blockwork IT at Milpitas, California
GPU Design Verification Engineer for AMD at Santa Clara, California
Senior Firmware Architect - Server Manageability for Nvidia at Santa Clara, California
Upcoming Events
DVCon Europe 2023 at Holiday Inn Munich – City Centre Munich Germany - Nov 14 - 15, 2024
SEMI MEMS & Imaging Sensors Summit, at International Conference Center Munich Germany - Nov 14, 2024
SEMI | MSIG MEMS & Imaging Sensors Summit at Munich Germany - Nov 14 - 15, 2024
SEMICON Japan 2024 at Tokyo Big Sight Tokyo Japan - Dec 11 - 13, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise