First Boeing 787-9 Dreamliner Begins Final Assembly

Newest 787 complements, extends the super-efficient family

EVERETT, Wash., June 2, 2013 — (PRNewswire) —  Boeing [NYSE: BA] has begun final assembly of the first 787-9 Dreamliner. The newest member of the 787 family began taking shape on schedule May 30 in Everett, Wash., when Boeing started joining large sections of the super-efficient jet.

"From the start, the entire 787-9 team has focused relentlessly on execution so that we fulfill the commitments to our customers," said Mark Jenks, vice president, 787 Airplane Development, Boeing Commercial Airplanes. "Integrating the 787-9 into our production system on time is another clear sign that we are well prepared and well positioned for the work ahead."

Boeing's global partners delivered the first 787-9 sections to final assembly on or ahead of schedule, and strong progress continues beyond, with major assembly under way on the other flight-test airplanes. "The dedication, quality and skill of our partners are helping drive our disciplined performance," said Jenks.

Boeing will build the first three 787-9s on its Temporary Surge Line in Everett to allow for smoother integration of the 787-9 into the production system while continuing to ramp up production across the 787 program.

The 787-9 will complement and extend the 787 family, offering airlines the ability to grow routes opened with the 787-8. With the fuselage stretched by 20 feet (6 meters), the 787-9 will carry 40 more passengers an additional 300 nautical miles (555 kilometers) while using 20 percent less fuel than similarly sized airplanes. The 787-9 leverages the visionary design of the 787-8, offering the features passengers prefer such as large, dimmable windows, large stow bins, modern LED lighting, higher humidity, a lower cabin altitude, cleaner air and a smoother ride.

The vertical stabilizer on this 787-9 reflects the new Boeing Commercial Airplanes livery, a refreshed look for the Boeing family of airplanes that started with the 747-8 and evolved with the 737 MAX. Many features of the livery on the original 787 are reflected in the new design. The prominent number designator on the tail helps distinguish various models within the same product family.

First flight of the 787-9 is scheduled for the second half of 2013, with first delivery to launch customer Air New Zealand set for early 2014. 20 customers around the world have ordered 355 787-9s, accounting for 40 percent of all 787 orders.

Contact:
Julie O'Donnell
Boeing Commercial Airplanes Communications
julie.o'donnell@boeing.com

More information: http://www.boeing.com/boeing/commercial/787family/787-9prod.page

Photo and caption are available here: http://boeing.mediaroom.com

SOURCE Boeing

Contact:
Boeing
Web: http://www.boeing.com

Featured Video
Latest Blog Posts
Bob Smith, Executive DirectorBridging the Frontier
by Bob Smith, Executive Director
Real Intent’s Prakash Narain on Growing into Management Role
Jean-Marie BrunetSiemens EDA
by Jean-Marie Brunet
Facing a New Age of IC Design Challenges Part 1
Anupam BakshiAgnisys Automation Review
by Anupam Bakshi
The Role of the Portable Stimulus Standard in VLSI Development
Jobs
Senior Post Silicon Hardware Engineer for Nvidia at Santa Clara, California
Senior CAD Engineer for Nvidia at Santa Clara, California
Design Verification Engineer for Blockwork IT at Milpitas, California
RF Design Engineer for Blockwork IT at San Francisco, California
Senior DPU System Application Engineer for Nvidia at Santa Clara, California
Hardware Engineer for PTEC Solutions at Fremont, California
Upcoming Events
3D & Systems Summit - Heterogeneous Systems for the Intelligently Connected Era at Hilton Dresden Hotel An der Frauenkirche 5, 01067 Dresden Germany - Jun 12 - 14, 2024
2024 IEEE Symposium on VLSI Technology & Circuits at HILTON HAWAIIAN VILLAGE HONOLULU HI - Jun 16 - 20, 2024
Design Automation Conference (DAC) 2024 at Moscone West, San Francisco CA - Jun 23 - 27, 2024
SemiconWest - 2024 at Moscone Center San Francisco CA - Jul 9 - 11, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise