All Categories : Technical Papers : AC/DC Electromagnetics Bookmark and Share

Title : Prototype Probe Development for Liquid Injection Shutdown System Tube Gap Detection by Remote Field Pulsed Eddy Current Technique
Company : Comsol
Date : 19-Apr-2013
Rating :
Downloads : 1

Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Featured Paper by T. V. Shyam, B. S. V. G. Sharma & J. N. Kayal

Pressurised Heavy Water Reactors (PHWR) play a prominent role in contributing power for the Nuclear Energy Programme in India. In 540MWe type PHWR reactors, there are horizontally placed Liquid Injection Shutdown System (LISS) tubes for injecting poison into the moderator to clamp down the nuclear power under trip conditions. The Horizontally placed LISS pipes are placed perpendicular to the horizontal Coolant Channels in the inter lattice positions as shown in Figure 1. The gap between the coolant channel and the LISS tube is critical considering the possibility of fretting damage in the event of closing of this gap. The Coolant channels consists of two co-axial tubes called Pressure tube (inner) and Calandria Tube (outer). The gap between LISS tube and calandria tube cannot be measured directly as the whole core of the reactor is enclosed in a vessel called Calandria vessel. Only easy access to the core is through the bore of the pressure tube for employing any inspection technique for measuring the gap. As the probing medium has to penetrate the pressure tube and calandria tube barriers, Electromagnetic technique only appears to be feasible for the inspection. Remote Field Pulsed Eddy Current technique is proposed for this measurement. The remote field originates from the exciter coil kept in the bore of the pressure tube and propagates through the outside metallic barriers and makes a re-entry into the pressure tube approximately at a axial distance of 2 diameters of pressure tube. The search coil is used at this location to pickup the prominent Remote Field. The pick up signals are further Digitally Signal Processed to gather information of the gap between LISS tube and calandrai tube. COMSOL Multiphysics software was used to map the poynting vector to guage the re-entry location of the remote field. The Poynting Vector mapping is shown in Figure 2. Further it is also simulated to know the order of the voltage to be picked by the remote pick up coil. The Figure 3 shows pick up voltage simulated for one turn.
User Reviews More Reviews Review This File
Featured Video
Latest Blog Posts
Vijay ChobisaSiemens EDA
by Vijay Chobisa
The Rise of Custom Acceleration
Bob Smith, Executive DirectorBridging the Frontier
by Bob Smith, Executive Director
Nomination Deadline for Phil Kaufman Award and Hall of Fame: June 30
Jobs
Senior Hardware Engineer IV – CA for Ampex Data Systems Corporation at Hayward, California
Senior DPU System Application Engineer for Nvidia at Santa Clara, California
Hardware Engineer for PTEC Solutions at Fremont, California
Design Verification Engineer for Blockwork IT at Milpitas, California
Senior Post Silicon Hardware Engineer for Nvidia at Santa Clara, California
Upcoming Events
SemiconWest - 2024 at Moscone Center San Francisco CA - Jul 9 - 11, 2024
Flash Memory 2024 Conference & Expo FMS2024 at Santa Clara Convention Center Santa Clara CA - Aug 6 - 8, 2024
SEMICON Taiwan 2024 at Taipei Nangang Exhibition Center Taipei Taiwan - Sep 4 - 6, 2024



© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise